Pumpmarket.us
Online Water Pump Store
FREE SHIPPING, FAST DELIVERY! Dismiss
Skip to contentOnline Water Pump Store
EASY SELECTOR
Telephone+1 (786) 613-5872
EmailInfo@pumpmarket.us
Webwww.pumpmarket.us
-----------$3,192.99
Free Delivery
Estimated 3-5 business days
Note: If This is a heavy item (over 130 lbs) Forklift or Dock Door is required at delivery location. Otherwise Please Request Liftgate service from here:
Single Stage Bare Shaft Centrifugal Pumps with their simple structures and reliable performance are the most suitable types for pumping the clean water or liquids which are widely used in water transport, water supply and distribution, irrigation, district cooling/heating and fire fighting.
The JCS-M80A4S pumps can be positioned with horizontal, sloping or vertical axis always with the motor upwards. The operating characteristics of the catalogue and label are to be understood for continuous service and with clear water (specific weight = 1000 kg/m3) with a max manometric suction height of approximately 1,5 m. For higher manometric heights and up to a max of approximately 6 m, the characteristics decrease in the various delivery data.
Type | Inlet | Outlet | Max. Capacity | Max. Head |
Inch | Inch | Gal/Min | Ft. | |
JCS-M80A4S | 4 | 3 | 871.8 | 459.3 |
Copyright © 2023 pumpmarket.us All Rights Reserved